| Gasket Installation Procedures | |
In order to ensure the optimum service life of our gasket materials it is important to not only choose the correct material for the application but to install and maintain it correctly. The following guidelines are designed to assist the end user in the assembly of our gasket materials : |
|
Flange Condition |
|
Remove the old gasket and check
that the joint faces are clean and free from indentations and scoring.
Radial (cross face) scoring is a particular concern, and can lead to
joint leakage. |
|
For most applications a surface
finish of between 3.2mm to 6.3mm Ra (125 to 250 micro inch) is recommended.
For very thin gaskets (0.4 mm or below) a surface finish as fine as 1.6mm
Ra is acceptable. Use a surface finish comparator e.g. Novus comparator
to check flange finish. |
|
Check that the flange faces are
parallel or that the pipework is sufficiently flexible to allow the flanges
to be pulled parallel and concentric without undue bolt loads. |
|
| Gasket | |
| Always use a new gasket. | |
The gasket material should be as
thin as possible. Out of flat or pitted flanges may require thicker gaskets
to accommodate the imperfections. To ensure optimum performance a minimum
thickness/width ratio of 1/5 is required (ideally 1/10) |
|
| Check that the gasket is in good condition and that the dimensions are correct for the class and size of the flanges. | |
Do not use jointing compounds, grease
or lubricants with our gasket materials. These compounds can affect the
friction between the gasket and the flange and can lead to premature
joint failure. |
|
If there is a requirement to fix
the gasket to the flange prior to assembly (e.g. large vertical flanges)
then a light dusting of spray adhesive e.g. 3M 77 spray may be used.
The adhesive should be applied sparingly and in isolated areas. |
|
| Bolting | |
Ensure the bolt and nut threads
are clean. Apply bolt lubricant to the bolt and nut threads and to the
face of the nut to be tightened. Do not apply grease or bolt lubricant
to the joint face. After cleaning and lubrication it should be possible
to run the nut along the full length of the bolt by hand. If this is
not possible the bolts and nuts should be refurbished or replaced. |
|
Scrape, wire brush or file as necessary
the back face of each flange where the bolt heads or nuts are to sit,
ensuring that the surfaces are clean and flat. |
|
| Use hardened flat washers to ensure even transfer of the load. | |
| Installation | |
| Ensure that the gasket is installed centrally | |
It is recommend that the bolts are
tightened using a controlled method such as torque or tension. If using
a torque wrench, ensure that it is accurately calibrated. |
|
| Tighten bolts in a star-like crossing pattern in the following sequence: | |
| • | Finger tighten nuts. |
| • | Tighten to 30% of the final load |
| • | Tighten to 60% of the final load |
| • | Tighten to full load |
| • | Make a final tightening sequence, working around the flange, tightening each bolt in turn until the specified torque is applied. |
| After Installation | |
Check that the flange faces are
parallel using a suitable tool e.g. NovusTM Flange Gap tool |
|
Retightening of the gasket should
not be necessary in most cases. If retightening is considered necessary
e.g. in applications involving thermal fluctuations or in the case of
thicker gaskets which are more susceptible to creep, then this should
only be performed after one cycle or up to 24 hours after process start
up. Retightening of compressed fibre gaskets at higher operating temperatures
and longer operating times may lead to a failure of the joint and should
be avoided. |
|
| Novus Sealing Limited |
| Hunsworth Lane, Cleckheaton |
| West Yorkshire, BD19 4EJ |
| United Kingdom |
| Tel: | +44(0)1274 878787 |
| Fax: | +44(0)1274 862588 |